Ministry Of Defence
Client: Normandy Barracks
Category: MOD
At these barracks, we originally installed four Duplex water softeners to provide treated water to their accommodation block. Due to increased demand, we have returned to the site and retrofitted two additional Duplex water softeners. (Images show the before and after installations.)
Kinetico delivers quality water to a reliable, consistent, and exacting standard, which is why many businesses around the world would entrust their commercial projects to us.
Challenges:
- Untimely hot water system failure
- Higher labour expenditures to remove scale from water treatment appliances
- Increase demand due to more personnel onsite
Why KineticoPro?
- On-going relationship allowed us to retrofit additional units and continue to maintain the system.
- As a manufacture, supplier and installer, Kinetico have full control over product, costs, and don’t rely on third parties.
- On-going maintenance support to ensure equipment lasts, giving added value to the customer
- Retro-fit/bespoke solutions can be supplied to each utility plant